To request boat removal in Kenosha, Wisconsin, send the vessel's current collection address and its dimensions, material, condition and support arrangement. If it remains at a berth or managed storage facility, identify that site rather than only the owner's address. Include photographs of the boat and access route, and say whether the trailer and loose equipment are part of the request. Use the free estimate form to give those details and any deadline. Confirm the method, destination and availability before agreeing to a collection date.
Assess the boat and its supports separately
A seized engine, damaged fiberglass and an unsafe trailer affect the plan in different ways. Report retained water, cracked or missing sections and loose components. For a trailer, describe tires, hubs, frame and coupling; a complete-looking hull does not establish that its trailer can be towed safely. Say whether the trailer belongs to the same owner and is included in the collection.
If the boat is on blocks, stands or a cradle, show that arrangement from a safe position without moving it or going underneath an unstable vessel. Identify any supports owned by a facility and ask who may release or move them. Collection of the hull does not automatically authorize disposal of surrounding property.
Ask whether intact transport is feasible or whether inspection or dismantling should be considered. If cutting is proposed, agree the location, permissions and collection of fragments and contents. Disposal of the hull needs a receiver for its actual material and condition. Reusable metal or fittings do not establish that all composite material can enter recycling.
Provide access information for the actual collection point
Show the path from the vessel to the road, including gates, corners, nearby structures, overhead lines, branches and other stored items. Measure limiting clearances and report where a carrier could stand and turn. Include the trailer and attached equipment in the load dimensions rather than measuring only the hull.
Describe the current ground surface and slope, including soft or unsupported areas. If a shared driveway, neighboring parcel or rented space would be used, establish permission for that part of the move. Ask the site controller about entry hours, commercial vehicle access and limits on lifting or dismantling before a visit is agreed.
Ask what further measurements or site inspection are needed. Do not tow an unsafe trailer, move stands or drag a compromised hull to create a presumed pickup position. Preparation should be assigned explicitly in the scope so the assessment reflects the actual site.
Separate marina recovery from onward road transport
If the boat is afloat, grounded or partly submerged, identify the exact facility or shoreline site, controller and condition. Provide berth details if applicable and any possible loading point. Obtain entry and working permission before assuming a dock, ramp or haul-out area can be used for the proposed method.
Stabilization, water recovery, towing, lifting and road transport may require separate arrangements. Ask who would perform each stage, which equipment is being assessed and what the quote includes. Availability for a land-stored boat does not establish specialized recovery at every harbor or water location.
A sailboat assessment should include mast position, overall height, keel and cradle details. Any unstepping or specialized lifting needs confirmation for that craft and facility. Report an immediate safety or pollution issue to the appropriate authority or emergency service; a quote request does not arrange emergency attendance.
Agree release and the receiving arrangement
A former tenant, owner or storage customer's boat needs a clear answer about who may authorize disposition. Control of the property is separate from ownership of the craft. Explain the circumstances and ask the relevant authority which procedure applies before arranging collection. A storage or property-sale deadline does not transfer another person's rights.
Ask the intended receiver whether it accepts the hull and contents, what preparation it requires and how it charges. Disclose fuel, oil, batteries, bilge contents and holding tanks. Agree who handles each material and where it will be accepted, without draining liquids onto the site or assuming every yard takes complete boats.
The disposal guide and cost guide help organize unanswered questions about those stages. List finishing work in the scope and keep the quote and release arrangements before work begins. For a collection outside Kenosha, provide its address and ask about availability through the Wisconsin hub; this page does not establish coverage of every surrounding county site.
